The rehabilitation of our Boulevard property continues to progress with new windows and sound treatment being completed. Drywall Installation is now in progress.

A dimly lit hallway with exposed framework and construction materials. Footprints are visible on the dark-colored wall. An open door at the end of the hallway shows a patch of light entering from an adjacent room, illuminating part of the space.
A partially renovated room with an arched, recessed window that has new trim installed. The space on the right has exposed insulation and drywall. Sunlight filters through the window, casting shadows on the walls. A small heater sits below the window.